{"id":2939,"date":"2021-11-03T14:40:32","date_gmt":"2021-11-03T13:40:32","guid":{"rendered":"https:\/\/greenalia.es\/actualidad\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/"},"modified":"2023-03-08T19:37:41","modified_gmt":"2023-03-08T18:37:41","slug":"greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain","status":"publish","type":"greenalia_news","link":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/","title":{"rendered":"Greenalia submits to public information a second photovoltaic plant, of 50 MW, planned in the south of Spain"},"content":{"rendered":"<ul>\n<li><strong>Quintos&#8221; (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after &#8220;El Tranco&#8221; (Almer\u00eda), in the phase of receiving reports after completing the IP<\/strong><\/li>\n<\/ul>\n<p><strong>Greenalia<\/strong> continues the processing of its pipeline in Spain, where in addition to the development of its projects in wind and biomass, it has more than 600 MW of photovoltaic in process in the regions of Andalusia and Valencia, two of the areas with the best solar resource in the Iberian Peninsula.<\/p>\n<p>The &#8220;Quintos&#8221; plant, planned in Alcal\u00e1 de Guadaira (Seville, Andalusia), is currently in the public exhibition phase, an installation that has the access and network connection rights and for whose development an investment of more than 30 million euros and the mobilization of more than 350 jobs are planned. The installation, with a power of 50 MWp, will have 86,207 state-of-the-art solar panels that will allow greater use in the capture of solar radiation.<\/p>\n<p>These panels will produce 101,324 MWh per year, that is, the consumption equivalent to 20,000 families and will have an important environmental impact by avoiding the emission of 14,500 tons of CO2 into the atmosphere.<\/p>\n<p>With similar figures, the plant of &#8220;El Tranco&#8221;, in the Andalusian province of Almer\u00eda, specifically in the municipality of Lubr\u00edn, continues its processing. In this case, the public information phase has ended and is pending the corresponding Environmental Impact Statement (DIA).<\/p>\n<p><strong>Low environmental impact <\/strong><\/p>\n<p>The documentation submitted for processing includes the different environmental studies, after which a low impact is concluded, being the earthworks and the occupation of the land during the construction phase the actions that will produce the greatest impact on the ground. In this sense, and with the aim of minimizing the impacts as much as possible, prevention measures are established during construction and corrective measures after the end of the works, so that the values prior to the construction phase are restored.<\/p>\n<p><strong>High-capacity areas<\/strong><\/p>\n<p>Greenalia has 660 MW in photovoltaic processing, in projects located in the main resource areas of the Iberian Peninsula (510 MW Andalusia and 150 MW in the Valencian Community), classified as <strong>Zone V, <\/strong>with an annual capacity factor of 22%-25% (higher than <strong>2,000 annual hours of production), <\/strong>much higher than the annual average of 18.8% (1645 equivalent hours, according to the 2018 Electric System Operation Report, published by REE).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quintos&#8221; (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after &#8220;El Tranco&#8221; (Almer\u00eda), in the phase of receiving reports after completing the IP Greenalia continues the processing of its pipeline in Spain, where in addition to the development of its projects in wind and biomass, it has more [&hellip;]<\/p>\n","protected":false},"featured_media":5512,"menu_order":0,"template":"","categories":[307,312],"class_list":["post-2939","greenalia_news","type-greenalia_news","status-publish","has-post-thumbnail","hentry","category-news","category-photovoltaic"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Quintos second Greenalia plant<\/title>\n<meta name=\"description\" content=\"Quintos&quot; (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after &quot;El Tranco&quot;\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Quintos second Greenalia plant\" \/>\n<meta property=\"og:description\" content=\"Quintos&quot; (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after &quot;El Tranco&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/\" \/>\n<meta property=\"og:site_name\" content=\"Greenalia\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-08T18:37:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"980\" \/>\n\t<meta property=\"og:image:height\" content=\"637\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/\",\"url\":\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/\",\"name\":\"Quintos second Greenalia plant\",\"isPartOf\":{\"@id\":\"https:\/\/greenalia.es\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg\",\"datePublished\":\"2021-11-03T13:40:32+00:00\",\"dateModified\":\"2023-03-08T18:37:41+00:00\",\"description\":\"Quintos\\\" (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after \\\"El Tranco\\\"\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage\",\"url\":\"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg\",\"contentUrl\":\"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg\",\"width\":980,\"height\":637},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/greenalia.es\/en\/#website\",\"url\":\"https:\/\/greenalia.es\/en\/\",\"name\":\"Greenalia\",\"description\":\"The Green Company\",\"publisher\":{\"@id\":\"https:\/\/greenalia.es\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/greenalia.es\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/greenalia.es\/en\/#organization\",\"name\":\"Greenalia\",\"url\":\"https:\/\/greenalia.es\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/greenalia.es\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/greenalia.es\/wp-content\/uploads\/2025\/04\/images.jpg\",\"contentUrl\":\"https:\/\/greenalia.es\/wp-content\/uploads\/2025\/04\/images.jpg\",\"width\":225,\"height\":225,\"caption\":\"Greenalia\"},\"image\":{\"@id\":\"https:\/\/greenalia.es\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/11053513\/\",\"https:\/\/www.youtube.com\/channel\/UCBTkVpU6nY2x3mmiRHtyWmg\/featured\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Quintos second Greenalia plant","description":"Quintos\" (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after \"El Tranco\"","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/","og_locale":"en_US","og_type":"article","og_title":"Quintos second Greenalia plant","og_description":"Quintos\" (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after \"El Tranco\"","og_url":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/","og_site_name":"Greenalia","article_modified_time":"2023-03-08T18:37:41+00:00","og_image":[{"width":980,"height":637,"url":"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/","url":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/","name":"Quintos second Greenalia plant","isPartOf":{"@id":"https:\/\/greenalia.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage"},"image":{"@id":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg","datePublished":"2021-11-03T13:40:32+00:00","dateModified":"2023-03-08T18:37:41+00:00","description":"Quintos\" (Seville), is the second Greenalia plant in the process of public information (IP) in Andalusia, after \"El Tranco\"","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/greenalia.es\/en\/articles\/greenalia-submits-to-public-information-a-second-photovoltaic-plant-of-50-mw-planned-in-the-south-of-spain\/#primaryimage","url":"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg","contentUrl":"https:\/\/greenalia.es\/wp-content\/uploads\/2021\/11\/SURESPANA_031121.jpg","width":980,"height":637},{"@type":"WebSite","@id":"https:\/\/greenalia.es\/en\/#website","url":"https:\/\/greenalia.es\/en\/","name":"Greenalia","description":"The Green Company","publisher":{"@id":"https:\/\/greenalia.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/greenalia.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/greenalia.es\/en\/#organization","name":"Greenalia","url":"https:\/\/greenalia.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/greenalia.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/greenalia.es\/wp-content\/uploads\/2025\/04\/images.jpg","contentUrl":"https:\/\/greenalia.es\/wp-content\/uploads\/2025\/04\/images.jpg","width":225,"height":225,"caption":"Greenalia"},"image":{"@id":"https:\/\/greenalia.es\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/11053513\/","https:\/\/www.youtube.com\/channel\/UCBTkVpU6nY2x3mmiRHtyWmg\/featured"]}]}},"_links":{"self":[{"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/greenalia_news\/2939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/greenalia_news"}],"about":[{"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/types\/greenalia_news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/media\/5512"}],"wp:attachment":[{"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/media?parent=2939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greenalia.es\/en\/wp-json\/wp\/v2\/categories?post=2939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}